Loading…
← CockpitCompetitor Analysis › EIEL.NS Enviro Infra Engineers LimitedOpen in the cockpit ↗

Enviro Infra Engineers LimitedEIEL.NSCompetitor analysis, valuation and peers

India · INR·Industrials›Environmental Services
Momentum laggard 18
Mkt cap
$312M
US dollars, full cap
Free float
30%
of shares outstanding
$/day
$1.05M
20-day average traded
Fwd P/E
11.5×
forward earnings
ROIC−WACC
-4.7 pp
WACC 16.7%
Hurdle
n/a
no reverse DCF
Next earnings
105 days
3 Mar 2027
Close · INR₹165.99
1D-1.3%
1W-5.7%
1M-9.0%
3M-15.8%
6M-12.4%
YTD-19.4%
1Y-27.4%
ATR %3.9%
Beta1.35
52w lowhigh32.9% off high

What Enviro Infra Engineers does

Employees: 1,844

Enviro Infra Engineers at a glance

Size Enviro Infra Engineers (EIEL.NS) is an India Industrials company (Environmental Services) with a market value of $312M, the 1047th largest of 1,066 India companies the cockpit tracks. Shares closed at ₹165.99 on 18 Nov 2026.

Performance Over six months the shares fell 12.4%, against -21.5% for the median peer and +3.8% for the India market (cap-weighted) — 8th highest of 21 in its peer set.

Growth Revenue grew 26.3% over the last twelve months (peer median -2.2%); the operating margin is 18.8% (peer median 8.1%).

Valuation It trades at 11.5× forward earnings against a peer median of 11.8× (4th cheapest of 10).

Capital Return on invested capital runs 4.7 points below its cost of capital (16.7% WACC).

Next results Next results expected around 3 Mar 2027 (exchange calendar; dates can move).

Relative performance

8010012021 May 202621 Aug 202618 Nov 2026EIEL.NS 88Peer median 79
Six months, rebased to 100: Enviro Infra Engineers against the median of its 20 peers (local-currency closes).

Enviro Infra Engineers financials

Reported figures in INR; fiscal year ends 2026-03-31. TTM = trailing twelve months.
TTMFY2025FY2024FY2023FY2022
Revenue₹14.0B₹11.2B₹10.5B₹7.29B₹3.38B
Revenue growth—+6%+45%+116%—
Gross profit₹3.08B₹2.79B₹2.72B₹1.75B₹926M
EBITDA₹2.98B₹2.53B₹2.58B₹1.68B₹853M
Net income₹1.74B₹1.83B₹1.76B₹1.08B₹571M
Free cash flown/a-₹2.51B-₹1.32B-₹1.50B₹853M
Capital expendituren/a₹1.82B₹466M₹334M₹136M
Total debt₹7.07B₹4.22B₹2.34B₹2.36B₹645M

Quarterly statements and history in the cockpit →

Enviro Infra Engineers competitor charts

The default views of Competitor Analysis ▸ Charts, drawn from the same data. Open them in the cockpit to change the axes, pin companies and read every value.

Performance: 6-month against 1-month return

-40%-20%0%-20%-10%0%+10%688178BHKMBR000826300187CAMBI3007743001900895688370603817U9E0005466001686803002973301305600217SCHPEIEL.NS6-month return →1-month return →
Up and to the right = strong over both horizons. Enviro Infra Engineers is the large dot.

Fundamentals: revenue growth against valuation

-20%0%+20%20×40×MBRCAMBI300774300190688370603817002973301305SCHPEIEL.NSRevenue growth (TTM) →Forward P/E →
Further right = faster growth; higher = more expensive. The dashed lines are the peer medians. Enviro Infra Engineers is the large dot.

Enviro Infra Engineers competitors and peer comparison

How Enviro Infra Engineers compares with its peers

Peer set: Industry: the same industry and sector in any market, nearest in size. This is the same default set the interactive Competitor Analysis opens with.

Enviro Infra Engineers against its 20 peers (data as of 18 Nov 2026)
MeasureEIEL.NSPeer medianRank in peer set
1-month return-9.0%-6.1%9th lowest of 21
6-month return-12.4%-21.5%8th highest of 21
Distance from 52-week high-32.9%-37.9%10th highest of 21
Revenue growth (TTM)+26.3%-2.2%4th highest of 21
Operating margin18.8%8.1%5th highest of 21
Forward P/E11.5×11.8×4th cheapest of 10
ROIC minus cost of capital-4.7 pp-1.7 pp8th lowest of 21
EV / EBITDA10.8×10.6×4th cheapest of 7
Net debt / EBITDA1.0×2.5×3rd least indebted of 7

Peer table

Peer set: Industry: the same industry and sector in any market, nearest in size
CompanyMarketMarket cap6M returnRevenue growthOp. marginForward P/EReq gDelivered g
Enviro Infra Engineers EIEL.NSIndia$312M-12%+26%19%11.5×n/an/a
Nanjing Wondux Environmental Protection Technology 688178.SSChina$311M-34%+27%-8%n/a49.6%-8.8%
SIIC Environment BHK.SISingapore$340M-8%-8%23%n/an/an/a
Mo-BRUK MBR.WAPoland$364M+14%+29%35%15.0×-6.3%+12.4%
Tus Environmental Science & Technology Development 000826.SZChina$249M-46%-13%-38%n/a-3.7%-11.7%
Yonker Environmental Protection 300187.SZChina$395M-31%+5%11%n/a7.9%+1.5%
Cambi CAMBI.OLNorway$402M+14%-9%11%49.8×1.5%+23.8%
BGT 300774.SZChina$421M-53%-17%0%8.8×n/an/a
WELLE 300190.SZChina$431M-34%-25%-15%6.2×-2.2%-12.5%
Dongjiang Environmental 0895.HKHong Kong$448M-27%+1%-31%n/a6.5%+0.2%
Shanghai Conglin Environmental Protection Technology 688370.SSChina$454M-6%-4%7%48.8×n/an/a
Fujian Haixia Environmental Protection 603817.SSChina$455M-22%-1%26%11.1×n/an/a
China Everbright Water U9E.SISingapore$466M-9%-33%34%n/a-1.4%-1.7%
Jinyuan EP 000546.SZChina$476M-45%+34%-3%n/an/an/a
Wuhan Sanzhen Industry 600168.SSChina$514M-14%-5%9%n/an/an/a
ECOVE Environment 6803.TWOTaiwan$539M-12%+1%17%n/an/an/a
QiaoYin City Management 002973.SZChina$544M-33%-11%10%11.5×-1.4%+4.9%
Zhejiang Feida Environmental Science & Technology 600526.SSChina$580M-14%+3%7%n/a-5.6%+9.5%
Shenzhen Lions King Hi-Tech 301305.SZChina$662M-27%+19%18%11.8×n/an/a
China Resources and Environment 600217.SSChina$686M-21%-19%-8%n/a-14.2%-2.2%
Seche Environnement SCHP.PAFrance$686M-3%+2%6%20.2×5.2%+13.3%

Questions

Which companies are Enviro Infra Engineers's closest peers?
The cockpit's peer set: Nanjing Wondux Environmental Protection Technology (688178.SS), SIIC Environment (BHK.SI), Mo-BRUK (MBR.WA), Tus Environmental Science & Technology Development (000826.SZ), Yonker Environmental Protection (300187.SZ), Cambi (CAMBI.OL), BGT (300774.SZ), WELLE (300190.SZ).
Is Enviro Infra Engineers expensive compared with its peers?
On forward p/e it trades at 11.5× against a peer median of 11.8×, 4th cheapest of 10 in its peer set.
How has Enviro Infra Engineers stock performed?
Over six months to 18 Nov 2026 the shares returned -12.4% against -21.5% for the median peer; over one year -27.4%.

How these numbers are made. Returns are close-to-close in local currency. Revenue growth and margins are trailing twelve months. Req g is the revenue growth that today's enterprise value requires for seven years at the company's own cost of capital; Delivered g is what it actually grew; the gap is the hurdle (honest precision about ±8 points, so read the ranking more than the decimal). No fair values, price targets or analyst ratings are shown, by design. Method and validation.