Loading…
← CockpitCompetitor Analysis › PSPPROJECT.NS PSP Projects LtdOpen in the cockpit ↗

PSP Projects LtdPSPPROJECT.NSCompetitor analysis, valuation and peers

India · INR·Construction & Infra›Engineering & Construction
Momentum weak 32
Mkt cap
$327M
US dollars, full cap
Free float
29%
of shares outstanding
$/day
$747,199
20-day average traded
Fwd P/E
20.8×
forward earnings
ROIC−WACC
-7.9 pp
WACC 15.4%
Hurdle
+8 pp
Req g minus delivered
Next earnings
71 days
28 Jan 2027
Close · INR₹771.55
1D-0.7%
1W-4.3%
1M-1.9%
3M-18.1%
6M-0.2%
YTD-11.1%
1Y-21.6%
ATR %4.1%
Beta1.42
52w lowhigh32.5% off high

What PSP Projects does

Employees: 16,791

PSP Projects at a glance

Size PSP Projects (PSPPROJECT.NS) is an India Industrials company (Engineering & Construction) with a market value of $327M, the 1031st largest of 1,066 India companies the cockpit tracks. Shares closed at ₹771.55 on 18 Nov 2026.

Performance Over six months the shares fell 0.2%, against -20.5% for the median peer and +3.8% for the India market (cap-weighted) — 4th highest of 19 in its peer set.

Growth Revenue grew 44.8% over the last twelve months (peer median -1.9%); the operating margin is 3.6% (peer median 6.9%).

Valuation It trades at 20.8× forward earnings against a peer median of 16.6× (3rd most expensive of 8).

Price implies For today's price to make sense, revenue must grow about 29% a year for seven years (Req g). Recent delivered growth is +20%, so the hurdle is +8 pp: the price needs faster growth than the company has been delivering — of companies that just grew 25–50% a year, 93.8% slowed down over the next four years.

Capital Return on invested capital runs 7.9 points below its cost of capital (15.4% WACC).

Next results Next results expected around 28 Jan 2027 (exchange calendar; dates can move).

Relative performance

8010012014021 May 202621 Aug 202618 Nov 2026PSPPROJECT.NS 101Peer median 78
Six months, rebased to 100: PSP Projects against the median of its 20 peers (local-currency closes).

PSP Projects financials

Reported figures in INR; fiscal year ends 2026-03-31. TTM = trailing twelve months.
TTMFY2025FY2024FY2023FY2022
Revenue₹34.8B₹31.5B₹25.1B₹25.1B₹19.4B
Revenue growth—+25%0%+29%—
Gross profit₹2.15B₹1.97B₹1.49B₹2.38B₹2.14B
EBITDA₹2.19B₹1.94B₹1.87B₹2.65B₹2.34B
Net income₹734M₹555M₹564M₹1.23B₹1.32B
Free cash flown/a₹1.14B-₹330M-₹3.74B-₹263M
Capital expendituren/a₹1.93B₹680M₹1.42B₹797M
Total debtn/a₹3.30B₹2.72B₹4.55B₹1.45B

Quarterly statements and history in the cockpit →

PSP Projects competitor charts

The default views of Competitor Analysis ▸ Charts, drawn from the same data. Open them in the cockpit to change the axes, pin companies and read every value.

Performance: 6-month against 1-month return

-50%-25%0%+25%+50%-20%0%+20%603797603909603017003001PHOE0028301898179318101945VINDHYATEL002949CAPD603176TORPSPPROJECT.NS6-month return →1-month return →
Up and to the right = strong over both horizons. PSP Projects is the large dot.

Fundamentals: revenue growth against valuation

-40%-20%0%+20%+40%20×40×6039090030011945002949CAPDKNRCONTORPSPPROJECT.NSRevenue growth (TTM) →Forward P/E →
Further right = faster growth; higher = more expensive. The dashed lines are the peer medians. PSP Projects is the large dot.

Capital: growth delivered against growth the price implies

0%+20%+40%+60%0%25%50%603797603017003001002830189860390318101945CAPDBONDADAPSPPROJECT.NSGrowth delivered (Del g) →Growth the price implies (Req g, 7 yrs) →
Above the diagonal = the price needs more growth than the company has been delivering; below = the price already allows for a slowdown. PSP Projects is the large dot.

PSP Projects competitors and peer comparison

How PSP Projects compares with its peers

Peer set: Industry: the same industry and sector in any market, nearest in size. This is the same default set the interactive Competitor Analysis opens with.

PSP Projects against its 20 peers (data as of 18 Nov 2026)
MeasurePSPPROJECT.NSPeer medianRank in peer set
1-month return-1.9%-13.0%3rd highest of 20
6-month return-0.2%-20.5%4th highest of 19
Distance from 52-week high-32.5%-35.0%9th highest of 21
Revenue growth (TTM)+44.8%-1.9%2nd highest of 20
Operating margin3.6%6.9%6th lowest of 20
Forward P/E20.8×16.6×3rd most expensive of 8
Growth the price implies (Req g, 7 yrs)28.7%-1.5%most demanding of 12
Growth delivered (Del g)+20.5%+1.1%2nd highest of 12
Hurdle (Req g minus delivered)+8.3 pp-4.8 pp3rd most demanding of 12
ROIC minus cost of capital-7.9 pp-1.0 pp5th lowest of 18
EV / EBITDA14.0×5.3×2nd most expensive of 8
Net debt / EBITDA-0.4×0.3×4th least indebted of 9

Peer table

Peer set: Industry: the same industry and sector in any market, nearest in size
CompanyMarketMarket cap6M returnRevenue growthOp. marginForward P/EReq gDelivered g
PSP Projects PSPPROJECT.NSIndia$327M0%+45%4%20.8×28.7%+20.5%
Guangdong Liantai Environmental Protection 603797.SSChina$328M-17%+7%38%n/a-1.5%+11.4%
C and D Holsin Engineering Consulting 603909.SSChina$328M-28%+23%2%17.7×n/an/a
ARTS 603017.SSChina$325M-46%-10%9%n/a-1.8%-8.5%
Zhongyan Technology 003001.SZChina$330M-34%-38%-30%55.2×6.4%-11.4%
Phoenix Asia PHOEUnited States$324M-38%-2%-17%n/an/an/a
Shenzhen Mingdiao Decoration 002830.SZChina$324M-29%+5%7%n/a1.5%-4.1%
Seikitokyu Kogyo 1898.TJapan$331M-1%-1%7%n/a-13.0%+1.1%
Ohmoto Gumi 1793.TJapan$331M+10%+44%4%n/an/an/a
CSD Water Service 603903.SSChina$331M-21%-9%-7%n/a-3.0%-8.8%
China Zhonghua Geotechnical Engineering 002542.SZChina$322M-32%-50%-142%n/an/an/a
Da Yi Cheng Technology 7951.TWOTaiwan$333Mn/an/an/an/an/an/a
Matsui Construction 1810.TJapan$319M+19%-5%7%n/a-11.3%+1.9%
Tokyo Energy & Systems 1945.TJapan$337M-21%+26%7%10.8×2.1%+6.9%
Vindhya Telelinks VINDHYATEL.NSIndia$317M+52%-21%8%n/an/an/a
Shenzhen Capol International & Associates 002949.SZChina$317M-22%-26%10%22.5×3.9%-8.7%
Capital CAPD.LUnited Kingdom$316M-8%+16%15%9.4×-5.0%+20.0%
Huitong Construction 603176.SSChina$339M-15%-2%9%n/an/an/a
Bondada Engineering BONDADA.NSIndia$315Mn/a+94%11%n/a22.7%+58.2%
KNR Constructions KNRCON.NSIndia$315M-17%-13%23%16.6×n/an/a
Torpol TOR.WAPoland$315M-20%+9%5%7.9×n/an/a

Questions

Which companies are PSP Projects's closest peers?
The cockpit's peer set: Guangdong Liantai Environmental Protection (603797.SS), C and D Holsin Engineering Consulting (603909.SS), ARTS (603017.SS), Zhongyan Technology (003001.SZ), Phoenix Asia (PHOE), Shenzhen Mingdiao Decoration (002830.SZ), Seikitokyu Kogyo (1898.T), Ohmoto Gumi (1793.T).
Is PSP Projects expensive compared with its peers?
On forward p/e it trades at 20.8× against a peer median of 16.6×, 3rd most expensive of 8 in its peer set. For today's price to make sense, revenue must grow about 29% a year for seven years (Req g). Recent delivered growth is +20%, so the hurdle is +8 pp: the price needs faster growth than the company has been delivering — of companies that just grew 25–50% a year, 93.8% slowed down over the next four years.
How has PSP Projects stock performed?
Over six months to 18 Nov 2026 the shares returned -0.2% against -20.5% for the median peer; over one year -21.6%.

How these numbers are made. Returns are close-to-close in local currency. Revenue growth and margins are trailing twelve months. Req g is the revenue growth that today's enterprise value requires for seven years at the company's own cost of capital; Delivered g is what it actually grew; the gap is the hurdle (honest precision about ±8 points, so read the ranking more than the decimal). No fair values, price targets or analyst ratings are shown, by design. Method and validation.